Stage 2 – Building Services Design Integration

 

Assignment No.2 – Building Technology: Thematic Study
TOPIC – Building Services Design Integration 

Draft Table of Contents – Hung Hom Station

 

  1. Lighting
    • Location
    • How they work – Artificial & Natural
    • Application Result on whole design
    • Maintenance/Cost
    • Any issues/success achieved
  1. HVAC
    • Location
    • How they work
    • Application Result on whole design
    • Maintenance/Cost
    • Any issues/success achieved
  1. Fire Protection (Staircase/Detectors/Fire-safety doors)
    • Location
    • How they work
    • Application Result on whole design
    • Maintenance/Cost
    • Any issues/success achieved
  1. Physical Security (CCTV/Access Control)
    • Location
    • How they work
    • Application Result on whole design
    • Maintenance/Cost
    • Any issues/success achieved

9 responses to “Stage 2 – Building Services Design Integration”

  1. josiahwesleyyu says :

    For the security system would you want to look at electrical wiring? Cause for a big building the electrical systems would be pretty impressive( I don’t really know)

  2. charonlct says :

    or can we pick only one aspect that we have particular interest to dig deep in it? I mean after having general research for the whole topic ie. building services.

  3. bt301allenpoon says :

    I agree with the suggestions from Josiah and Lung. Stephanie your TOC needs refinement as now it lacks “Introduction”, “Conclusion”, etc., that makes your proposed writing like a catalogue of technological descriptions rather than a genuine essay.

    Can you update it before Wednesday night?

Leave a reply to josiahwesleyyu Cancel reply